  • Ocean Gold Coast

    Posted December 1st, 2019 by MDA Engineers with No Comments

    Project:         Ocean, Gold Coast Client:           Meriton Group Architect:     SJB Architects Developer:   Karimbla Constructions Services Ocean, the most iconic Surfers Paradise beachfront landmark, is under construction. When complete, Ocean is set to be one of the tallest residential towers in Australia, rising 76 storeys and 252 metres skyward. This stunning Meriton super tower and thriving new precinct will be home to 262 bespoke apartments and 446 luxury 5-star hotel suites, a vibrant retail precinct, childcare ...

  • Coolum Library Extension

    Posted November 19th, 2019 by MDA Engineers with Comments Off on Coolum Library Extension

    Project: Coolum Library ExtensionClient:    Complete UrbanValue:    $2.4 million MDA Consulting Engineers were engaged to provide design and documentation services for an extension to the existing public library at Coolum on the Sunshine Coast. The original building was designed in the 1980’s and extended in the 1990’s. The design features a very distinctive curved roof that provides lots of natural light and internal ...

  • CSi Club Southport

    Posted November 13th, 2019 by MDA Engineers with Comments Off on CSi Club Southport

    Project:   CSi Club SouthportClient:    BuildwiseValue:    $5 million In the heart of the Southport CBD, the Award Winning CSi Club Southport was brought to life in 2013. Originally named the Southport Workers Community Club and located on a piece of Southport history, the old train station, CSi Club Southport received a major facelift and now hosts 265 gaming machines, 2 full service bars, 2 receptions, restaurant, bottle shop, ...

  • Prince Charles Hospital Adolescent Treatment Facility

    Posted October 31st, 2019 by MDA Engineers with Comments Off on Prince Charles Hospital Adolescent Treatment Facility

    Project:  Prince Charles Hospital – Adolescent Extended Treatment CentreClient:    ADCO ConstructionsValue:    $27 million Construction of Children’s Health Queensland’s new statewide adolescent mental health extended treatment centre, the first of its kind in Australia, is progressing well and on track to open in early 2020. The roof of the $27 million Adolescent Extended Treatment Centre, located on the campus of The Prince Charles Hospital campus at Chermside in Brisbane, is now complete and ...

  • Cambridge Residences Robina

    Posted October 29th, 2019 by MDA Engineers with Comments Off on Cambridge Residences Robina

    Project: Cambridge Residences – Laver Drive, RobinaClient:    EastviewValue:   $162 million Perfectly positioned in the heart of Robina’s CBD, Cambridge Residences offer a truly unmatched location, only 2 minutes to Robina Town Centre, less than 10 minutes to Bond University, 15 minutes to stunning Gold Coast beaches, a short drive to the M1 Motorway and within walking distance is CBUS Stadium, Bond University, many well-respected Schools, Robina Hospital, a major medical ...

Testimonials

  • “I was very happy with the communication & the services provided throughout the project. The services and time frame met my expectations, the level and standard of documentation met my requirements, and staff were very courteous and responsive to my needs. MDA Consulting Engineers fees were competitive, and I would be pleased to use their services again” – Deborah Aitken.

    Aitken Custodians Pty Ltd